How Long Does a Kitchen Remodel Take?

how long does a kitchen remodel take

Once construction starts, it’s common for a kitchen renovation to require six to 10 weeks, although plenty of projects fall outside this range. The scope of your kitchen remodel in Colorado Springs will determine the project length.

Read on to learn more about how to determine an accurate timeline for your kitchen upgrade.

Start With Planning the Kitchen Remodel

You might have some basic ideas for your new kitchen, but when it’s time to develop a detailed plan, you may not be sure how to proceed. The planning process not only dials in the design, but it should also establish a timeline for the project. You’ll also determine how to do the remodeling on a budget during the planning phase.

Meeting with a professional designer is essential during this time. This expert has the skills to take your dreams of a new kitchen and turn them into a functional plan complete with a timeline and budget.

How long does a kitchen remodel take, and can you accurately predict it? Although issues can arise during the remodeling process, having a designer’s plan in hand for the work makes it easier to stay on track and match the projected timeline.

Steps for Setting a Kitchen Remodeling Timeline

Once a design is developed, it’s time to work through the steps necessary for completing your kitchen remodeling project. Each step could run into roadblocks along the way. Keeping your project on track often involves knowing how to deal with roadblocks, and a remodeling design professional has the experience to help you.

Obtaining Permits and Materials

You might need a week or two to handle the permit process. Local building inspectors need detailed plans, including any changes planned to existing plumbing and electrical lines.

You’ll need to order the materials for the work. Depending on the appliances, flooring, lighting fixtures, countertops, and cabinets you’ve selected, it could take a few hours to a few months to receive the materials.

When you hire a professional to design and manage your project, this person can obtain permits and order materials for you.

Demolition of the Existing Layout

How long does a kitchen remodel take to remove the existing materials? Demolition usually takes a couple of days.

If the contractor must carefully remove some items like flooring while preserving the cabinets, demolition could go on a little longer. If you’re tearing everything out of the kitchen, the process may take less time because contractors don’t have to worry about preserving anything.

If you’re expanding the kitchen and moving walls and plumbing fixtures, it might take a couple of weeks or longer before construction can begin.

Putting in the New Materials

Construction and building the space back is the fun part, as you can slowly see your dreams come to life. However, it’s also the longest phase of the project, usually requiring four to eight weeks.

Extensive projects that involve moving plumbing, electric lines, and walls might last 12 weeks or longer. If you’re keeping the flooring and appliance layout but putting in new countertops and cabinets, it might only require a couple of weeks.

You might experience delays if contractors find rot in framing or electrical problems as they work. Fixing these unforeseen problems can add a couple of weeks to the project.

Finding the right contractors who can stick to your timeline can be frustrating. If your contractors are working on multiple job sites at the same time, you might not see them for a few days.

Hiring a kitchen remodeling designer means this professional will find and manage the contractors. This person’s experience gives your project a better chance of staying on track.

Final Inspection

As the work progresses, local building inspectors will visit the kitchen and ensure all of the work matches all relevant codes in Colorado Springs.

Once the work ends, you’ll do a walk-through with the contractor and designer. If everything is done to your satisfaction, you can make the final payment.

Trust Our Experts To Keep Your Kitchen Remodeling Project on Track

How long does a kitchen remodel take, and — more importantly — how do you keep it moving forward? At Rowe And MacPhail Renovations & Construction LLC, we put together a timeline you can trust. We have the experience required to handle curveballs regarding material delays and subcontractor availability as they arise, keeping everything on track.

We incorporate your kitchen remodeling ideas in the design planning process, giving you the kitchen of your dreams in a stress-free experience. For a free estimate, contact us today at (719) 963-7209.

Contact us today to learn more about our services and how we can help you transform your home.